Meet Team 20
1.
September 20 (In-person) – All Team Members Present
Creation of the iMessage group (20) chat for DP-1.
Assigning the roles of each team member throughout DP-1.
Discussing our Objectives and Constrains specific to our case.
Writing our Need Statement.
-Completion of Milestones 0 and 1
2.
September 23 (iMessage) – All Team Members Present
Dividing the Preliminary Research among team members.
3.
September 27 (In-person) – All Team Members Present
Gathering ideas from each team member.
Finalizing the design for both the two-piece Colostomy bag and the Supporting Belt.
Sketching the pieces for the final design.
Completion of Milestone 2.
4.
October 3/4 (In-person) – All Team Members Present
Completion of the Preliminary Prototypes for both our pieces. Figuring out the exact dimensions of the locking mechanism on the Colostomy bag and the Supporting Belt and sketching them.
Finishing the Design Configuration and the Prototype Conceptualization documents.
Completion of Milestone 3.
5.
October 11 (In-person) – All Team Members Present
3D Printing the Locking Mechanism Prototype
Sewing a new Belt made of material like nylon (closest material to nylon available in the studio)
6.
October 21 (In-person) – All Team Members Present
Re-Printing the Locking mechanism prototype.
Dividing the written proposal and completing it.
Discussing the proper way to present our proposal.
Completing the one-page slide-deck.
7.
October 22 (In-person) – All Team Members Present
Completing the Video showcasing our prototype and the way our design works.
Individually presenting a 3 Minute Thesis to Assessment Administrators